Skip to main content
US MARKING10

Service

Parking Garage & Deck Marking

Numbered stalls, level wayfinding, pedestrian routes and directional graphics that make a multi-level deck legible at 5 mph.

The problem

What it costs to leave it

Structured parking lives or dies on legibility. A driver entering a deck has a few seconds and poor light to work out which way the aisle runs, where the ramp is and which level they are on.

When that information is missing you get wrong-way movements at ramp heads, cars stopped in aisles while people hunt for a space, and pedestrians walking in traffic lanes because there is no marked route.

Garage marking is also a maintenance problem, not a one-off. Tyre scrub on a concrete deck wears a line far faster than on open asphalt, particularly on ramps and turns.

Underground parking garage with teal and white numbered stalls and a white pedestrian crosswalk

Numbered stall marking and pedestrian crossing

What's included

Line items, not vague promises

Every quote is itemised against this list, so you can see exactly what you are paying for.

  • Numbered and lettered stall marking, including reserved and EV bays
  • Level identification and directional wayfinding graphics on walls and columns
  • Pedestrian walkways in high-visibility epoxy or thermoplastic
  • Crosswalks, stop bars, arrows and chevron markings at ramp heads and entrances
  • Column and kerb hazard marking in yellow-and-black chevrons
  • Bollards, delineator posts, wheel stops and speed bumps supplied and set
  • Low-odour material options and phased overnight work for occupied buildings

Our process

Four steps, no surprises

You get a fixed written price before anything starts, and a walkthrough before we leave.

  1. 1

    Free Site Visit

    We walk the lot, measure it, and note surface condition, drainage and current stall count.

  2. 2

    Written Quote in 24 Hours

    A line-itemised scope and price — materials, stall counts and timeline, with no obligation.

  3. 3

    Scheduled Work

    Most jobs start within 3–5 days. We phase the work so sections of your lot stay open.

  4. 4

    Final Walkthrough

    We inspect every line with you before we leave, and confirm cure times before you reopen.

Materials & standards

The right product for the traffic it takes

  • Coatings built for concrete decks

    Concrete needs a different product from asphalt. We use deck-appropriate epoxy and traffic coatings that bond to sealed concrete and stand up to tyre scrub on ramps and turns, where ordinary paint wears through in months.

  • Working in an occupied building

    Enclosed decks trap fumes, so material choice matters as much as scheduling. We use low-odour products where ventilation is limited and work level by level overnight so the deck stays open.

  • Marked to MUTCD

    Arrows, stop bars, crosswalks and chevrons follow MUTCD conventions, so the markings mean what drivers already expect them to mean.

Project photos

Our own work, not stock

Every photo below is a job our crew completed.

  • Underground parking garage with teal and white numbered stalls and a white pedestrian crosswalk
    Numbered stall marking and pedestrian crossing
  • Parking garage interior with white crosswalk stripes, directional arrows and red painted structural columns
    Directional arrows and crosswalk marking
  • Parking garage level marked with large white wayfinding graphics and yellow and black hazard chevrons on a column
    Level wayfinding graphics and column hazard marking
  • Parking garage bays with crisp white stall lines, T-marks, wheel stops and orange delineator posts
    Stall layout with wheel stops and delineators
  • Parking garage with a bright orange epoxy pedestrian walkway, orange bollards and a speed bump
    Epoxy pedestrian walkway and traffic calming
  • Parking deck entrance with grey deck coating, a bold white chevron marking and a high-contrast crosswalk
    Deck entrance chevron and crosswalk

FAQ

Questions we get asked

Something not covered? Call (773) 858-1077 and ask.

Free estimate

Get a quote for parking garage & deck marking

Quotes within 24 hours. Most jobs scheduled in 3–5 days.

Call NowGet Quote