Skip to main content
US MARKING10

Service

ADA Compliance Marking & Signage

Accessible stalls, access aisles, access routes and signage marked and installed to the ADA Standards for Accessible Design.

The problem

What it costs to leave it

Accessible parking is the most commonly cited deficiency on commercial lots, and it is the easiest for a complainant to photograph. Faded stall symbols, a missing access aisle or a sign mounted too low are all visible from the street.

The requirements are specific: how many accessible stalls a lot needs scales with total stall count, van-accessible stalls need a wider access aisle than standard accessible stalls, and there has to be a marked route from the aisle to an accessible entrance.

None of it is difficult to get right — but it does need to be measured, not eyeballed. We survey what you have, tell you where it falls short, and mark it correctly.

Accessible parking stall marked in blue inside a parking garage with orange delineator posts and a crosswalk

Accessible stall and access aisle in structured parking

What's included

Line items, not vague promises

Every quote is itemised against this list, so you can see exactly what you are paying for.

  • Walk-round compliance review of your existing accessible parking, with photographs
  • Accessible stall and van-accessible stall marking, including the access aisle striping
  • Painted accessibility symbols in each accessible stall
  • Marked, unobstructed access route from the access aisle to an accessible entrance
  • Post-mounted and wall-mounted signage, including van-accessible designation
  • Kerb ramp and crossing marking where the route requires it
  • A written summary of what was changed, for your compliance records

Our process

Four steps, no surprises

You get a fixed written price before anything starts, and a walkthrough before we leave.

  1. 1

    Free Site Visit

    We walk the lot, measure it, and note surface condition, drainage and current stall count.

  2. 2

    Written Quote in 24 Hours

    A line-itemised scope and price — materials, stall counts and timeline, with no obligation.

  3. 3

    Scheduled Work

    Most jobs start within 3–5 days. We phase the work so sections of your lot stay open.

  4. 4

    Final Walkthrough

    We inspect every line with you before we leave, and confirm cure times before you reopen.

Materials & standards

The right product for the traffic it takes

  • The standard we work to

    We mark to the ADA Standards for Accessible Design, and to the MUTCD for traffic-control markings and signage. Those are the published standards our work follows — we are contractors, not a certifying body, and we do not claim to be one.

  • Stall counts scale with lot size

    The number of accessible stalls required, and how many of those must be van-accessible, is set by your total stall count. We take that off the measured layout rather than estimating, because getting the count wrong is the single most common failure we find.

  • Access routes get missed

    A correctly marked stall that opens onto a route blocked by a kerb, a planter or a parked car does not comply. We check the whole path from the access aisle to the entrance, not just the stall.

Project photos

Our own work, not stock

Every photo below is a job our crew completed.

  • Accessible parking stall marked in blue inside a parking garage with orange delineator posts and a crosswalk
    Accessible stall and access aisle in structured parking
  • Freshly striped asphalt parking lot with yellow stall lines, a hatched no-parking zone and a painted ADA symbol
    Full restripe with ADA stall and hatched access aisle
  • Large commercial lot at dusk with extensive yellow hatching, multiple ADA symbols and traffic cones during layout work
    New-build lot layout marked out at dusk

FAQ

Questions we get asked

Something not covered? Call (773) 858-1077 and ask.

Not legal advice

This page is general guidance, not legal advice. Accessibility requirements depend on your property, and enforcement can involve federal, state and local rules. Confirm current requirements with your local building department or an accessibility consultant before relying on anything here. Where we state a requirement, the governing document is the ADA Standards for Accessible Design.

Free estimate

Get a quote for ada compliance marking

Quotes within 24 hours. Most jobs scheduled in 3–5 days.

Call NowGet Quote